All Galleries › Deck Projects › Kumbartcho Dam
OSA Galleries › Deck Projects Kumbartcho DamClick/tap on an image to view the full-sized image(s) | ||||
Click/tap on an image to view the full-sized image(s) |
Walkway Refurbishment Kumbartcho Dam at Everton Hills | |
---|---|
Client: | Morteton Bay Regional Council |
Boardwalk Systems: | Outdoor Structures Australia |
Engineering: | Westera Partners |
As part of the refurbishment of Kumbartcho Dam at Everton Hills, an old timber walkway was replaced with a new OSA hardwood boardwalk. The walkway, which incorporates Deckwood and Joistwood uses OSA's Ballina style handrail. The timber walkway was fully prefabricated at our premises and lifted into place. |
Please contact Outdoor Structures Australia for additional information.