All Galleries › Deck Projects › Kumbartcho Dam
OSA Galleries › Unnamed Kumbartcho DamClick/tap on an image to view the full-sized image(s)  | ||||
Bridge sections ready for instalation  | 
Craning in the walk-bridge  | 
Erection of the walk-bridge  | 
Completed walk-bridge  | 
Walkbridge from water-side  | 
Click/tap on an image to view the full-sized image(s)  | ||||
| Walkway Refurbishment Kumbartcho Dam at Everton Hills | |
|---|---|
| Client: | Morteton Bay Regional Council | 
| Boardwalk Systems: | Outdoor Structures Australia | 
| Engineering: | Westera Partners | 
| 
 As part of the refurbishment of Kumbartcho Dam at Everton Hills, an old timber walkway was replaced with a new OSA hardwood boardwalk. The walkway, which incorporates Deckwood and Joistwood uses OSA's Ballina style handrail. The timber walkway was fully prefabricated at our premises and lifted into place.  | |
Please contact Outdoor Structures Australia for additional information.
